DIP & SOLDERING

DIP Assembly & Hand Soldering

DIP Assembly & Hand Soldering with project-specific engineering review, controlled manufacturing, inspection, traceability and delivery.

DIP Assembly & Hand Soldering

PROJECT CONTROL

From project input to controlled delivery

Four verifiable checkpoints connect engineering, manufacturing, inspection and delivery.
01
Gerber · BOM · CPL

Project inputs

02
DFM · FAI · pilot

Engineering & NPI

03
SPI · AOI · X-Ray

Process inspection

04
Test · box build · records

Delivery scope

SERVICE BOUNDARIES

Scope and delivery controls

01

工艺按器件匹配

根据器件形态、孔位、热容量、焊接可达性和外观要求确定插件与焊接方式。

02

关键器件确认

极性、高度、方向、端子装配和特殊辅料在首件阶段确认。

03

焊后检查与测试

外观、焊点、剪脚、清洁和项目功能检查按受控标准执行。

PROJECT INPUTS

Project fit and required data

Scope, suitable projects, process, equipment, quality controls and required customer data are confirmed for each project.

Service scope

Process, sourcing, testing, assembly and delivery boundaries are defined during review.

Core equipment

Printing, 3D SPI, placement, reflow, AOI, X-Ray, FAI, LCR and project testing as applicable.

Quality control

Incoming, first article, in-process, final and outgoing checks with project traceability.

Customer data

Gerber, BOM, CPL / PnP, quantity, test, programming, packaging and target delivery.

Have a project to review?

Upload your files for a more accurate manufacturing assessment.

Request a quote

FAQ

Questions about DIP Assembly & Hand Soldering

Project-specific limits and standards are confirmed during review.

Gerber, BOM, CPL / PnP, quantity, test, programming, packaging and target delivery requirements are recommended.

Call nowGet a quote